Energy, mobility, logistics, manufacturing, construction and real estate, where software meets hardware.
56 case studies · 9 industries

Built a consumer iOS and Android app for solar generation, battery storage, EV charging and smart-home device control - backed by an IoT sensor network and AI optimisation engine. Shipped from clickable AI prototype to App Store in 16 weeks.

Built an iOS and Android app that ingests live device-level consumption from a circuit-clamp IoT sensor network, surfaces AI insights and runs smart-control automations across appliances - shipped from clickable AI prototype to App Store in 12 weeks.

Built a rider mobile app for an all-electric premium ride-hailing service - live EV map, charge-aware vehicle selection, real-time booking, and trip-completion CO₂ accounting - shipped from clickable AI prototype to App Store in 10 weeks.

Designed a shipment tracking portal and operations console for an Antwerp freight forwarder moving ocean and air freight between Asia and Europe, and built the ops console as a clickable demo: shipment files with predicted and carrier ETAs, milestone timelines that show their sources, an exception queue against response targets and carrier data feed health.

Designed and built a clickable dispatch console for a Guadalajara distributor of building materials and beverages: import tomorrow's orders, plan routes for four depots on a map, route list and timeline, check every manual change against the fleet's limits, publish before the 20:00 deadline and watch the day live.

Designed an offline-first driver app and built a clickable supervisor web view for an Istanbul last-mile parcel carrier: a live board of every driver on shift, one queue for exceptions, a proof-of-delivery audit that shows how far from the stop each parcel was handed over, and driver records with document expiry and scores.

Designed and built a clickable warehouse management system for a Budapest third-party logistics provider running two multi-client warehouses: a dashboard driven by carrier cut-offs, outbound orders with FEFO allocation by lot, QC holds, and a lot trace that shows every consignee a batch went to.

Designed and built a clickable operator console for an Almaty freight broker that matches shippers' road loads with vetted small carriers: a live load board from posting to invoice, full load detail with border and TIR data, a carrier vetting queue with automated checks, and carrier payouts with quick pay and fraud holds.

Designed and built a clickable cold chain monitoring platform for an Addis Ababa logistics provider that stores and moves vaccines, biologics and fresh fish: live temperatures from cold rooms, reefer trucks and box loggers, excursions measured against each product's profile, escalating alerts, and a QA disposition signed electronically.

Designed and built a clickable customs documentation workspace for a licensed broker in Dar es Salaam: every consignment on one board from first invoice to release, an HS classification workbench where a licensed agent confirms each suggested code, and a declaration builder that blocks lodgement until every check passes.

Designed and built a clickable inbound visibility platform for a Stockholm furniture and home goods retailer buying from about 180 factories in Vietnam, China, India and Turkey: every purchase order followed from supplier confirmation through production milestones, inspection and shipping to predicted arrival at the distribution centre, measured against the date the goods are needed.

Designed and built a clickable operator console for a Bratislava charge point operator running about 1,200 public chargers in Slovakia and Czechia: live network health, every charger and its OCPP state, audited remote commands, and session detail with signed meter values, the full price calculation and refunds within each user's limit.

Designed and built a clickable staff service console for a Lusaka water and electricity utility: one queue for faults, leaks and billing queries with live SLA status, a customer 360 for every account, and disconnection batches that check every safeguard before a crew is sent.

Designed and built a clickable grid asset monitoring platform for a regional electricity distribution company in Sindh: a control room dashboard, an alarm list built for shift work, an asset register with nameplate data, and an explainable health and risk score for every transformer and breaker - all read-only from SCADA.

Designed and built a clickable trading and risk console for a Madrid renewable generator selling wind, solar and battery output on the Iberian power market: a quarter-hour position grid, day-ahead and intraday auction bids with approval before submission, and an intraday blotter where orders over a trader's mandate wait for a second person.

Designed and built a clickable carbon accounting product for a Taipei software company that sells to small and mid-size manufacturers: a collection tracker for every site and source, utility bill upload with OCR review, and a GHG Protocol and ISO 14064-1 inventory where any figure opens the bill, factor and formula behind it.

Designed and built a clickable fleet electrification planner for a Lyon utility and facilities services company with about 1,100 vans, cars and light trucks across 14 depots: which vehicles an EV can replace based on a year of daily driving, what switching costs, and how many chargers each depot needs against its grid connection.

Designed a car sharing platform for a Bologna operator of about 700 mostly electric cars and built its operator console as a clickable demo: a live fleet map with telematics and remote commands behind safeguards, damage reviews that compare before and after photos, and a fines desk sorted by the deadline to identify the driver.

Designed a shared e-scooter and e-bike platform for a Bogotá operator running about 4,000 scooters and 1,500 e-bikes under a district permit, and built its clickable operator console: a dashboard that watches the permit's limits, a live fleet map with IoT state and alarms, vehicle records, and a planner that sends crews to swap batteries and rebalance where demand is forecast.

Designed and built a clickable operator console for a Doha parking operator running ANPR car parks and on-street pay-by-phone zones: live occupancy on one map, car parks with tariffs, devices and pre-booking inventory, and an exceptions queue that clears unmatched plate reads with ranked suggestions.

Designed and built a clickable driver safety console for a fuel and LPG distributor running about 350 tanker and delivery trucks across Côte d'Ivoire: explained driver scores, a review queue for telematics and AI dashcam events, a live map with curfew and SOS alerts, and coaching built on evidence drivers can see and dispute.

Designed and built a clickable lost property console for a Vienna transit authority and its partner venues: log and track every found item through a full custody chain, review AI-suggested matches against passengers' lost reports with a clerk always deciding, and keep valuables and official documents on their own controlled routes.

Designed and built a clickable machine telemetry and OEE platform for a Romanian injection moulding and assembly plant that supplies automotive Tier 1 customers: live state of 60 moulding machines and 8 assembly lines, OEE with availability, performance and quality per machine, line and shift, a queue for clearing unclassified stops and a Pareto of top losses.

Designed and built a clickable quality console for a glass container maker near Pune with 4 furnaces and 12 forming lines: cameras and edge models classify every bottle and jar at the cold end, uncertain images go to a person, rejects are traced to the mould cavity that made them, and every decision shows the rule behind it.

Designed and built a clickable production planning system for a make-to-order maker of stainless steel commercial kitchen equipment in Graz: sales orders with projected finish and slack, a drag-and-drop schedule board on real work centre capacity, and capable-to-promise dates the plant can actually hit.

Designed and built a clickable predictive maintenance console for an integrated pulp and paper mill in Ontario: anomaly scores that explain which signals moved, an alert queue sorted by consequence, remaining useful life shown as a band against planned shutdowns, and work requests sent to the CMMS - advisory only, never controlling a machine.

Designed and built a clickable quality and supervisor console for a Bulgarian contract manufacturer of infusion pump and diagnostic analyser assemblies: a bilingual instruction library with revisions and effectivity, a live floor view of every cleanroom station, and a device history record queue that quality engineers review and release with an e-signature.

Designed and built a clickable supplier quality console for a Serbian maker of tractors, telehandlers and backhoe loaders: raise supplier corrective action requests, drive containment and 8D problem solving to a verified root cause, track the cost of each defect and score about 450 suppliers on a published formula.

Designed and built a clickable property management platform for a Chicago manager of about 4,200 apartments: a dashboard of occupancy, collections and open repairs, arrears worked through the same steps for every resident, security deposits tracked under Chicago and Illinois rules, and work orders with SLA clocks, entry permission and owner approval limits.

Designed and built a clickable listings and agent CRM for a Cypriot sales and lettings agency with 22 branches and about 180 agents: listings with EPC and agency agreement checks, portal syndication, a lead pipeline with response timers, offers that wait for AML clearance, and a progression checklist from reservation to transfer of title.

Designed and built a clickable host dashboard for a Chiang Mai SaaS start-up whose customers run 1 to 10 short-let listings themselves: one calendar across Airbnb, Booking.com, Agoda and Vrbo, a Today screen ordered by urgency, foreign guest reporting (TM30) tracked per guest, and nightly price suggestions that stay inside the host's own limits.

Designed and built a clickable security console for a Kuwait City landlord with six multi-tenant office towers: one alarm queue sorted by priority and age, visitor check-in with ID checks that keep only the last four characters, and an emergency console that records who is inside but never controls escape route doors.

Designed and built a clickable leasing console for a build-to-rent operator with 11 buildings and about 2,600 homes in Vilnius: an application pipeline that refuses moves until checks pass, a review screen that shows each criterion as a fact against the policy with no overall score, decisions made by a named person with a second reviewer on every decline, and one hold per unit with a backup queue.

Designed and built a clickable maintenance platform for an integrated facilities management company in Cairo: requests from QR codes, phone and BMS alarms triaged against each client's priority matrix, work orders with live SLA timers, and a monthly review of breaches and service credits that recalculates as breaches are agreed.

Designed and built a clickable site project management platform for a Dhaka general contractor running 12 live residential and school sites: a portfolio dashboard with site health, a master programme with critical path and baselines, the daily site diary, and a variations register that routes every change to the right approver by limit.

Designed and built a clickable snagging and handover console for a Dubai apartment developer-builder: a snag register with plan pins and photo evidence, subcontractor fixes and disputes, a handover readiness rule on every unit, and a queue for defects buyers report after moving in.

Designed and built a clickable equipment tracking console for a Minas Gerais civil engineering contractor and its plant hire division: a live map of about 900 assets, an asset register with service and certificate state, the full life of each machine, and one alert queue for theft, geofence, defect and certificate events.

Designed and built a clickable estimating and bidding platform for a Helsinki general contractor that prices about 150 tenders a year: a tender register with stage gates, a Talo 2000 estimate workspace where every rate carries its source and validity date, and a bid review queue that routes each frozen price to the right approver from a fixed sign-off grid.

Designed and built a clickable subcontractor compliance platform for a Glasgow main contractor with about 400 subcontractors and 25 live sites: a register where every firm's status carries its reason, three-way pre-qualification reviews against a 5-working-day clock, and an expiry tracker that shows what each lapsed certificate will stop.

Designed and built a clickable farm management app for the member farms of a grain cooperative in Córdoba, Argentina: a field operations log, an agrochemical register that ties every spray to a signed agronomic prescription, application records ready for inspectors and grain buyers, and costs and gross margin per lot. The full design adds an offline mobile field app and a cooperative console.

Designed and built a clickable crop monitoring console for a Kigali agronomy advisory firm serving tea, maize and avocado growers: satellite index maps per field with cloud masked out, a queue of stress anomalies to triage, scouting photos with an advisory-only AI suggestion, and advice that cannot name an unregistered pesticide or reach a grower without senior approval.

Designed and built a clickable farm office console for a group of five suckler beef and sheep farms in County Galway: one animal register for every herd and flock, withdrawal locks that block the sale of treated animals, AIM notification status on every birth and movement, and sale lots that cannot go to the mart until every pre-sale check passes.

Designed and built a clickable operator console for a Kathmandu company that buys vegetables and fruit from hill farmers and sells them graded and delivered to restaurants, hotels and retailers: tomorrow's supply against demand, a matching board that turns order lines into collection lots, and hub intake that grades every lot and traces it back to the farmer.

Designed and built a clickable irrigation console for a Muscat grower with two date palm farms on groundwater wells and a greenhouse farm on desalinated water: live soil moisture per zone, ET-based recommendations a person approves, and valve and pump control behind interlocks that hold even when the network is down.

Designed and built a clickable operations platform for an indoor vertical farm in Dubai growing leafy greens, herbs and microgreens across 3 warehouses: room health against recipe bands, a farm map down to every rack and tray, setpoint suggestions that a head grower must approve, and a lot trace from seed lot to customer.

Designed and built a clickable yard manager console for an Irish equestrian centre with 70 stables and a riding school: every horse with its feeding plan, allergies and food chain status, health observations that escalate until someone acknowledges them, and school horse workload checked against the yard's welfare policy.

Designed and built a clickable dealer management system for a Warsaw car dealer group with 6 showrooms and 4 service centres: one lead inbox for every source, a deals pipeline and deal desk with discount limits and live gross profit, and group-wide vehicle stock with ageing bands and portal publishing.

Designed and built a clickable dealer portal for a South African car classifieds marketplace: stock synced from a feed with a price rating against comparable cars, a lead board with a 1-hour reply target, and buyer chats and calls that run through the platform without exposing the buyer's phone number.

Designed and built a clickable head office console for a chain of 18 car service and tyre centres in Riyadh: every booking across branches, job cards with itemised quotes for extra work, a fixed-price service menu by vehicle model, and warranty claims checked by date and mileage.

Designed and built a clickable operations and QA console for a Calgary company with about 70 mobile inspectors: a dispatch board that checks skills, certifications and job caps, a QA queue timed against a 4 business hour target, and a review workspace that turns an inspection into a graded condition report with repair estimates.

Designed and built a clickable pricing platform for a Seoul used-car remarketing company: a pricing model gives every car the same starting estimate with comparable sales, a confidence level and the factors that moved the price, buyers set the final offer after inspection within guardrails, and analysts measure every model version against what the car actually sold for at auction.

Designed a self-care app and care agent console for a Lima mobile and home fibre operator, and built the care console as a clickable demo: a masked customer 360 with audited assisted actions, a claims queue and workspace run against regulatory deadlines, and SIM swap reviews scored by weighted fraud signals.

Designed and built a clickable network operations centre console for a Lagos tower company with about 5,500 sites: live site power and battery autonomy, an alarm console that groups alarms into incidents with a suggested root cause, trouble tickets with a separate SLA clock for each mobile operator, and penalty exposure per tenant.

Designed and built a clickable ops console for an Amsterdam mobile brand that sells eSIMs online only: follow every order from payment to a live line, see each SM-DP+ event, work rejected port-ins with plain-language reasons, and review orders and transfers held by fraud rules.

Designed and built a clickable dispatch console for a Dublin fibre installation contractor working for two network operators: a control room for the day, a dispatch board that checks skills, certifications and patch before allocating, a full evidence record for every job, and a jeopardy queue that catches missed appointments before the operator calls.

Designed and built a clickable billing ops console for an Auckland business telecom provider: monthly bill runs checked against last month before release, a disputes queue and workbench on a working-day SLA clock, and collections that hold back disputed amounts and refuse to suspend accounts a safeguard protects.
Enterprise Software Engineering - Human + AI
Contact Us
© 2026 - Copyright. All Rights reserved Oceanlab
Location
Global Headquarters
21 Merchant Road, 3rd Floor, Singapore 058267
Main corporate office and leadership operations
North America Office
548 Market Street, PMB 12345, San Francisco, CA 94104
Client operations and business development
India Office
402 Shivalik Shilp II, SG Highway, Ahmedabad 380015
Engineering and delivery center
Enterprise Software Engineering - Human + AI
Contact Us
Locations
Global Headquarters
21 Merchant Road, 3rd Floor, Singapore 058267
Main corporate office and leadership operations
North America Office
548 Market Street, PMB 12345, San Francisco, CA 94104
Client operations and business development
India Office
402 Shivalik Shilp II, SG Highway, Ahmedabad 380015
Engineering and delivery center
© 2026 - Copyright. All Rights reserved Oceanlab